Phase 2 of this project included a complete renovation of the existing vault and control area. Additional secondary shielding was provided for the vault maze as well as duct shielding. H&H Design-Build provided Design, Equipment Coordination, Pre-Construction and Construction Management services.
Project Description: Phase 1 of this project included the addition of a new vault, control and electrical room. During the design phase it was determined the vault would be constructed above a portion of a cavern. Foundations were designed to support the new vault. We took advantage of adding this vault to the adjacent linear […]
This project renovated a Varian Clinac 600C Linear Accelerator Vault. Renovation included rotating the equipment layout 90 degrees. The primary and secondary radiation shielding had to be modified significantly to protect staff due to the new orientation. All finishes were upgraded to the new facility standards. While the room is compact – the patient perspective […]
This project renovated approximately 7,000 s.f. of clinical space to house a new high-field MRI/Linear Accelerator and improve functional program and clinical patient flows for the M.D. Anderson Cancer Center at Cooper University in Mount Laurel, NJ. The existing Cyberknife vault required extensive concrete cutting and removal to support the new equipment requirements. The existing […]
This project renovated approximately 1,000 s.f of existing clinical space to support a new hybrid operating room for Norton Healthcare in Louisville, KY. The existing room previously contained an antiquated interventional MRI system and was completely encased in 2” of steel on six sides. The existing system was constructed on raised access flooring over a […]
This project constructed approximately 800 of new building addition clinical space to house a ZAP Radiosurgery System and renovated approximately 13,500 s.f. of clinical space for Medical Oncology, Radiation Oncology, Women’s Diagnostic Imaging Center, General Diagnostic Imaging Center and general support spaces for Medstar Georgetown University Cancer Institute in Clinton, MD. The project was completed […]
This project constructed approximately 9.500 s.f. of clinical areas to support a four-story Proton Therapy Vault and approximately 5000 s.f. of renovations to the Vince Lombardi Cancer Center at Medstar Georgetown University Hospital in Washington, D.C. H&H Design-Build/Architection provided Site Analysis, Space Programming, Architectural Design, Interior Design, Equipment Coordination, Construction Documents, Preconstruction Services, Construction Management […]
This project constructed approximately 18,500 s.f. of clinical areas to support a new Cancer Center in the entire first floor shell-space of a new medical office building for Norton Healthcare in Louisville, KY. H&H Design-Build/Architection provided Construction Documents, Preconstruction Services, Construction Management and Contract Administration services. Major medical equipment included 2 Varian linear accelerators with […]
This project renovated approximately 39,000 s.f. of existing Emergency Department and Imaging Departments for Norton Children’s Hospital in Louisville, KY. H&H Design-Build provided Construction Documents, Preconstruction Services, Construction Management and Contract Administration services. The project provided new finishes for the Emergency Department and upgrades to the Imaging Department as well as a new “Fast Track” […]